GMP ONLINE CONSULTANCY
Your Account | Shopping cart
Homepage

Available Documents
spacer
Show all documents
Standard Operating Procedure
ChecklistsMaster Plans
Quality Contracts
spacer

spacer

OUR SERVICES
spacer
Online Consultancy
Consultancy Request
Consultancy Process
News & Trends
Newsletter
spacer

Regulation & Guides
spacer
FDA
EMEA
Regulatory Links
Organisations
Pre-Approval-Inspection
spacer

About us
spacer
Payment Methods
Company Profile
Terms and Conditions
Privacy Policy
Contact
spacer

GMP Guide
spacer
Documenation
Standard Operation Procedure
FDA
Process Validation
spacer

Bookmark this site:
 
Mr. Wong Del.icio.us Facebook Digg Technorati StumbleUpon
 



Computer system validation and maintenance checklist
Checklist

Updated Version
  Description:
This checklist will enable you to systematically assess the strengths and weaknesses of a computerised system validation using a uniform approach. A scoring option is included which enables you to compare different systems and helps you to judge the compliance status of these systems. The checklist, which contains more than 80 questions, can be used to evaluate potential validation contract vendors/suppliers (front cover letter included). This checklist was created in line with regulatory requirements such as FDA 21 CFR Part 211.68 Automatic, mechanical and electronic equipment, modified FDA 21 CFR Part 11 Electronic records and electronic signatures, FDA Guidance for industry: Computerised systems used in clinical trails, European Guide to Good Manufacturing Practice (1992) Annex 11 Computerized Systems, PIC PH 1/97 Guide to Good Manufacturing Practice for Medicinal Products (Feb. 1997) Annex 5 Computerised Systems, the Blue Book (FDA), PIC/S Guide to Inspection of Computerised Systems, the APV Guide to Annex 11 (EU), GAMP Guide to Validation (EU and FDA) and PDA Technical Report 18 (FDA).
 
  Download sample page
spacer
spacer
  Price: 185.– EUR *
(appr. 239.- USD)
Add to cart  
* additional 19% tax for customers from germany / no shipping costs will be charged

  Delivery item:
  Icon Editable Word Document
You will be able to enter your personal data into the Word Document.
Please notice: We do not deliver hard copies.
  Further details:

Table of Contents

1. Computerized System Validation (CSV) Master Plan
2. CSV SOPs integrity
3. User Requirement Specifications (URS)
4. System Risk Assessment
5. Vendor Assessment
6. Validation Protocol in general
7. Test Plans in general
7.1. Test plan approval
7.2. References to specifications
7.3. Instructions
7.4. Judgeable
7.5. IQ test plans and reports
7.6. OQ test plans and reports
7.7. PQ test plans and reports
8. Validation report
9. SOPs and Procedures
9.1. System management
9.2. Configuration management
9.3. Security Management Procedure
9.4. Back-up procedures
9.5. Change control
9.6. Maintenance und problem
9.7. Operating Instructions
9.8. Training
10. Response Approval



spacer
spacer
spacer Customers who bought this item also bought:
 
Change control system
Annual product review
Supplier certification program
Deviations (failure investigations, non-conformance)
Product Recall


overview top

© GMP ONLINE CONSULTANCY - Impressum - Imprint